FabTime Cycle Time Management for Wafer Fabs
  Home   |   Software   |   Newsletter   |   CT Course   |   Library   |   Contact   |   About   |   News
 
  

Validating Simulation Model Cycle Times at Seagate Technology

Authors:

Navdeep S. Grewal
Alvin C. Bruska
Timbur M. Wulf
Seagate Technology
Jennifer Robinson
FabTime Inc.

Abstract:

This paper describes the validation of cycle times in a factory simulation model of a new Recording Head Wafer manufacturing facility at Seagate Technology, Minneapolis, MN. The project goals were to determine which factors were causing cycle time deltas between the model and the actual factory, and to add detail to the simulation model to bring cycle times closer to reality. The study found that the most significant contributors to the cycle time delta were number of tools, number of operators, level of operator cross-training, and assumptions about rework, downtime, and equipment dedication.

This paper is available in Adobe PDF format. You can download a copy in PDF (53 KB) by right-clicking on this link. If you like this paper, you might want to subscribe to FabTime’s Cycle Time Management newsletter, a free monthly email publication.

 
Subscribe to FabTime’s free monthly email newsletter on wafer fab cycle time management.
Send mail to "Webmaster" at our domain name with questions or comments about this web site, or use our contact form.
Copyright © 1999-2008 FabTime Inc.